Mackinac Economic Alliance

Ph: (906) 984-2095
330 N. State St., St. Ignace, MI 49781

UP Electrical Power Resolution

We recommend that all our elected legislative representatives at the federal and state level, along with the Governor’s office, support a major upgrade of the transmission capability through the EUP, down along through the Straights of Mackinac to Gaylord, and strongly urge MISO and FERC to recognize the connection between the Upper and Lower Peninsulas.

Read the Resolution here: