Mackinac Economic Alliance

Ph: (906) 984-2095
330 N. State St., St. Ignace, MI 49781

MI Electric Infrastructure Act

We recommend that all our elected legislative representatives at the federal and state level, along with the Governor’s office, support a major upgrade of the transmission capability through the EUP, down along through the Straights of Mackinac to Gaylord, and strongly urge MISO and FERC to recognize the connection between the Upper and Lower Peninsulas.

Read a summary of SB282/HB4575 Michigan Electric Infrastructure Act policy, goals and mechanics:  SB282_HB4575 Summary 11.02.15

Sign a Letter of Support for SB282/HB4575 and return it to your local Chamber office, or mail directly to:   Mackinac Economic Alliance, PO Box 361, Cedarville, MI 49719.